Steel Frame Erection
Site | Ecology | Work starts | Tree Planting | Aerial view | Steelwork | Steelwork2 | Inside | Video
August 2014 - Work is well underway on the new factory with the steelwork being erected. These pictures show the start of the Test area being erected, shown highlighted in the drawing on the right.
The young trees planted in the autumn of 2013 are growing well and becoming established on the slopes of the hill.
The photo on the left shows some of the young trees with the view down to the valley below.